Pictures
Project information
Details:
Study, installation, and commissioning of two thermal power transmission systems of 45 MWth per unit, from the already installed gas-to-water heat exchangers of units I and II to the already installed energy recovery systems from the exhaust gases of units III and IV for preheating the condensate in units III and IV, respectively.
Works executed:
Assembly and welding of pipelines, construction of new piping systems – isolation network for unit IV of Agios Dimitrios TPP.
- TPP Agiou Dimitriou
- 20/11/2015 - 5/12/2015
- ERGOTEM Α.Ε.Τ.Β.Ε - Athens