Our company, comprised of experienced Engineers (Mechanical Engineers and Welding Engineers) and Supervisors, has managed to establish itself as a partner of major construction companies in the field, completing high-demand projects in a short period since its foundation.

Some significant projects our company has executed are as follows:

NEW PROJECT: Natural Gas Interconnector Greece – Bulgaria (IGB PROJECT)

Scope of Work: Mechanical Erection of the natural gas metering/regulation station in Stara Zagora – Bulgaria, GMS-2.

NEW PROJECT: Flue Gas Desulfurization System at Unit V of the Agios Dimitrios Thermal Power Plant (TPP)

Scope of Work: The company was specifically assigned the prefabrication and erection of pipelines for the project, including Carbon Steel pipes, Hastelloy material, stainless steel pipes 304L and 316, HDPE for water networks, Fiberglass Reinforced Pipes (FRP/GRP) for Limestone/Gypsum Slurry/Spray Headers/Absorber’s Recirculation networks, and the related supports, valves, and other fittings of these pipelines.

Erection and installation of pipelines – Komotini
September 16, 2024
Erection and installation of pipelines – Amfitriti, Alexandroupolis
September 16, 2024
The IGB Project (Gas Interconnector Greece-Bulgaria)
September 13, 2024
Flue Gas Desulfurization System at Unit V of the Agios Dimitrios Thermal Power Plant (TPP) (Piping)
March 3, 2022
Erection of the Natural Gas Metering/Regulation Station in Nea Mesimvria
March 3, 2022
Erection of Tanks
March 3, 2022
Biomass Pumping Station – DETEPA
March 3, 2022
District Heating of Ptolemaida
March 3, 2022
Prefabrication and erection of pipelines for Ptolemaida 5
March 3, 2022
Upgrade of boilers for units I and II of the Thermal Power Plant (TPP)
March 3, 2022
LNG Revythousa – Prefabrication and erection of pipelines
March 3, 2022
Prefabrication, assembly, and welding works
March 3, 2022
Upgrade of boilers for units III and IV
March 3, 2022
Expansion of district heating distribution networks
March 3, 2022
Florina District Heating – Transmission Pipeline
March 3, 2022
Thermal Power Transmission Systems
March 3, 2022
Replacement of central pipeline section -K
March 3, 2022
Auxiliary Pumping Stations – Substations
March 3, 2022
Agios Dimitrios TPP – Assembly and welding of pipelines, construction of new piping systems
March 3, 2022
Removal of existing pipeline
March 3, 2022
Completion of Triantafyllia Dam in Florina
March 3, 2022
Repair of leaks in the old network
March 3, 2022
Construction of gas pipeline networks
March 3, 2022
Pipeline construction
March 3, 2022
Supportive works
March 3, 2022
District Heating of Amyntaio – Network Expansion
March 2, 2022