NGP

Flue Gas Desulfurization System at Unit V of the Agios Dimitrios Thermal Power Plant (TPP) (Piping)

Pictures

Project information

Details:

Prefabrication and erection of the project’s pipelines, including carbon steel pipes, Hastelloy material, stainless steel, HDPE for water networks, steel and galvanized pipes for compressed air networks, and Fiberglass Reinforced (FRP/GRP) pipes for the limestone/gypsum slurry networks of the desulfurization system, as well as the related supports, valves, and other fittings.