NGP

Removal of existing pipeline

Pictures

Project information

Details:

Removal of the existing insulated steel pipeline with a nominal diameter of DN 400 (inlet – return/inactive water transmission pipeline).

Works executed:

Removal of the existing insulated steel pipeline with a nominal diameter of DN 400 (inlet – return).