Details:
Upgrade of boilers for units I and II of the Agios Dimitrios Thermal Power Plant (TPP) to reduce NOx emissions through primary measures.
Works executed:
- Assembly and welding of ducts, construction of new pipelines.
- Existing building area
2nd Area inside the boiler (pressure pumps) – energy balancing
- TPP Agiou Dimitriou
- 31-10-18 - In progress